Methodology

PU. Spray Application of Poly Urethane Foam

methodology-step1-1
methodology-step1-2

PU Forms an Impermeable Insulation Layer of thickness as per the requirement of the Client & 45-50 kg/N13 density.

Elastomeric protective coating

methodology-step2-1
methodology-step2-2

After PU spray layer, Supply and apply of Elastomeric protective coating over the entire Sprayed PU foam area.

Water Test

methodology-step3-1
methodology-step3-2

Water leak test to done by the Client/Contractor.

Geotextile

methodology-step4-1
methodology-step4-2

Supply and laying Geotextile Separation layer of 100-120gsm/ with an overlap 20 cm over the entire coated area.

Slope Preparation

methodology-step5-1
methodology-step5-2

Supply and fixing Ridges in panels and using expansion joint boards and cement mortar.

Screed Concrete

methodology-step6-1
methodology-step6-2

methodology-step6-3

Supply and Protective Screed concrete (M25/10) of strength and to the slope 100-150.

Joints Treatments

methodology-step7-1
methodology-step7-2

Supply and apply Joint Sealant to all concrete Screed joints treatments and along the parapet inter sections.

Final coat

methodology-step8-1
methodology-step8-2


methodology-step8-3

Supply and apply of final Acrylic Cementitious UV Protective coating above the entire roof area. (Along the Parapet, Duct opening and Prebuilt Utility Stands).